Home / Services
Turnkey Execution

Passive Fire Protection Services

Four integrated services, one accountable partner. Every project is delivered end-to-end so nothing falls between supplier, applicator and certifier.

Service 01

Fire Safety Audit

A firestop installation is only as good as the survey behind it. Our audit maps every breach in your fire-rated walls and floors and benchmarks it against compartmentation requirements.

  • Penetration survey — electrical, HVAC, plumbing, fire-fighting and communication services passing through rated barriers.
  • Joint & opening assessment — construction joints, curtain wall perimeter gaps, blank openings and dampers.
  • Gap analysis report — photographic register of non-compliant conditions, risk-ranked with recommended tested systems.
  • BOQ & budget estimate — quantities and system-wise costing for planning and tendering.
Fire safety audit — unsealed cable riser penetration identified during site survey
3M Fire Barrier Sealant CP 25WB+ product range
Service 02

Supply of Genuine 3M Products

As an authorised 3M Passive Fire Protection distributor, we supply the complete range with full traceability, technical datasheets and manufacturer backing.

  • Complete 3M PFP range — sealants, sprays, mortars, wraps, collars, pillows, putty pads, composite sheets and cast-in devices.
  • Genuine & traceable — direct authorised supply chain; batch documentation available.
  • Technical support — datasheets, tested system details (UL/EN) and application guidance with every supply.
  • Pan-India delivery — project-site delivery coordinated with your construction schedule.
View the 3M Product Range
Service 03

Firestop Installation

Products don't stop fire — correctly installed systems do. Our trained applicator teams execute strictly to tested system details with stage-wise quality control.

  • Trained applicators — crews trained on 3M firestop systems and application methods.
  • System-based execution — every penetration matched to a classified detail; no improvised sealing.
  • Quality control — stage inspections, depth/annular checks and photographic records for each location.
  • Coordinated with site — sequencing aligned with MEP works to avoid rework and re-penetration issues.
Firestop installation — shaft wall cable penetrations sealed with 3M system
Mumbai International Airport — certified project handover
Service 04

Certification & Documentation

The deliverable that proves compliance. We hand over a complete firestop dossier that satisfies consultants, fire authorities, auditors and insurers.

  • Penetration register — location-wise schedule of every sealed opening with system reference.
  • Labelling — each installation tagged on-site for future identification and re-inspection.
  • Photo documentation — before/during/after records for every location.
  • Installation certificate — formal certification of workmanship and materials for project handover.
Common Questions

Firestopping FAQs

Quick answers for project teams evaluating passive fire protection scope.

What is passive fire protection (PFP)?

Passive fire protection contains fire and smoke within the compartment of origin using fire-rated walls, floors and — critically — firestop systems that reseal every penetration and joint in those barriers. Unlike active systems (sprinklers, alarms), PFP works without activation, power or human intervention.

Why do service penetrations need firestopping?

Every cable tray, duct, or pipe that passes through a fire-rated wall or floor creates a breach. Unsealed, these openings let fire and toxic smoke spread between compartments in minutes, defeating the building's fire design. Tested firestop systems restore the barrier's original fire rating.

What does "turnkey" mean in your scope?

We take single-point responsibility for the entire firestopping package: auditing the site, selecting tested 3M systems, supplying genuine material, installing with trained applicators, and issuing the certification dossier at handover.

Are your installations certified?

Yes. Installations follow tested and classified system details, and we issue location-wise documentation — penetration register, labels, photo records and installation certificates — that supports fire-NOC, audits and insurance requirements.

At what project stage should firestopping be planned?

Ideally at design stage, so tested details and budgets are locked before MEP execution. Practically, we join projects at any stage — including operational facilities that need retrofit audits and remediation.

Firestop Audit

Start with the audit

Every firestopping engagement we run starts with knowing what is actually in the walls and slabs. Tell us the building and we will set up the survey.

  1. We call you back within one business day to understand the building and its fire NOC timeline.
  2. On-site audit. A floor-wise penetration register — every cable tray, pipe, duct and joint through a rated wall or slab, photographed and measured.
  3. Gap analysis and costed BOQ using tested 3M UL-listed systems, prioritised so you can phase the work.
  4. Audit fee adjustable against remediation awarded to us within 90 days. The register is yours either way.
💬 Or WhatsApp us site photos or drawings

Request an audit

Goes straight to Sachin Majali's team. We reply within one business day.

We use these details only to reply to your enquiry. Privacy policy.

Get a Scope-Wise Quotation

Share your drawings or schedule a site visit — we'll respond with a system-wise proposal.

Request a Quote
📞 Call Us 💬 WhatsApp Book Audit