Home / MEP & Turnkey Contractors
For MEP & Turnkey Contractors

Firestopping for MEP & Turnkey Contractors.
One Register Across Your Sites.

Firestopping sits inside your MEP package and is usually the last item closed. We take the whole scope — survey, tested 3M systems, installation and certificates — so it does not hold up your handover.

Contractor Enquiry

Send the drawings. We call you back.

Share the project name and the services in your scope. We call within one business day, look at the drawings or the site, and give you a costed firestop BOQ against tested systems.

  1. We call you back within one business day.
  2. Survey and penetration schedule from your drawings or on site — every cable tray, pipe, duct and joint through a rated wall or slab.
  3. Tested 3M UL-listed system matched to each condition, in a costed BOQ.
  4. Installation and handover pack — labels, photographs, register and installation certificates.
💬 Or WhatsApp us drawings or site photos

Send us your project

Goes straight to Sachin Majali's team. We reply within one business day.

We use these details only to reply to your enquiry. Privacy policy.

Why It Goes Wrong

Sealed at the end, recorded nowhere.

In the operating buildings we audit, 30–60% of service penetrations are unsealed or sealed with material that is not part of any tested system. Much of that began as firestopping inside a larger MEP package, closed out without a register.

The result reaches the contractor later: consultant snags, a client asking for certificates that do not exist, or rework above finished ceilings.

  • One accountable firestop team — audit, supply, installation and certification, with no gap between supplier and applicator.
  • Tested systems, not just sealant — every seal matched to a classified 3M system detail.
  • One register format on every site — labelled, photographed and numbered.
  • 24-month written workmanship warranty with a 7-day rectification promise.
  • 50+ turnkey firestop projects — airports, towers, pharma and chemical plants.
Delivered At

Sites where the work was inspected hard.

Mumbai International Airport · World One Tower · One BKC · Reliance Patalganga & Nagothane · Cipla Goa (11 plants) · 3M Plant Ranjangaon

Questions Contractors Ask

Before you sub-let the scope

Can you take the firestopping scope on several of our sites?

Yes. This is how we work with MEP and turnkey contractors: the same survey method, the same tested 3M systems and the same register format on every site, so your handover documents look alike from one project to the next.

Do you supply 3M firestop material without installation?

Yes. Ecotech Innovations is an authorised distributor of 3M Passive Fire Protection products. We supply sealants, wraps, collars, mortars, pillows and devices with product documentation, and we can advise which tested system each condition needs.

What do we receive at handover?

A penetration register, labelled installations, a photographic record and installation certificates. This is the set a consultant, client or fire NOC process asks for.

What warranty do you give?

A written workmanship warranty of 24 months on firestop installation, with a 7-day rectification promise. The workmanship warranty covers installation defects; product performance is covered by the applicable 3M product warranty.

When should we bring you in?

During the services stage, before ceilings and shaft cladding close up. Sealing and recording penetrations while they are still open costs far less than doing it after handover snags are raised.

📞 Call Us 💬 WhatsApp Book Audit